UCAK TEKSTIL TORBALI

  • Location Torbali /Izmir
  • Mounting Type Ground Mounted (5.1.h)
  • Estimated Annual Production (kWh/year) 17.614.520
  • Estimated Specific Production (kWh/kWp/year) 1.634
  • Number of Modules 19.600