All electrical works for the flat glass and glassware production lines installed at the Trakya Cam and Paşabahçe facilities—located within the Şişecam complex in Targovishte—were executed on a turnkey basis. For Trakya Cam, the scope included the preparation of all MV/LV designs, the supply of transformers and switchgear units, the design and manufacture of Main Distribution Panels (ADP), Motor Control Centers (MCC), and automation panels, as well as installation and commissioning for the newly established TB2 line (in addition to the existing TB1 line) and the associated coating and lamination lines. Similarly, for the Paşabahçe facility, the project covered the preparation of all MV/LV designs, the supply of transformers and switchgear units, the design and manufacture of ADP, MCC, and automation panels, and the installation and commissioning of the new glassware line added to the existing one.
Location
Targovishte, Bulgaristan
Project Names
Trakya Cam TB2 Düz Cam Facility Projeleri, Paşabahçe Züccaciye Production Facility Project